Rain Barrel Distribution Event - Culver City

Jan
20
Eligibility & Guidelines:

Participants in the rain barrel distribution program must meet the following requirements and follow all guidelines below:

  • Must be a resident in West Basin’s service area.
  • Limit two (2) rain barrels per household, while supplies last. This may be reduced, based upon demand.
  • Rain Barrel must be installed within 30 days, and may be subject to verification and inspection by West Basin and or the Metropolitan Water District of Southern California.
  • Recipients must email photo(s) of installed rain barrel(s) within 30 days of receiving barrel(s). 
  • The rain barrel must be mounted in a way that allows it to receive water unimpeded from a rain gutter.
  • Should not block or restrict access to walkways or pathways.
  • Should be elevated six (6) inches off the ground with a cinder block or another solid foundation.
  • Should be secured in place with straps for safety.
  • Home must be equipped with rain gutters and downspout(s).

Click Here to RSVP

When

Saturday, January 20, 2018 -
8:00am to 12:00pm

Where

West Los Angeles College
9000 Overland Ave.
Culver City, CA 90230

Contact

Phone: 310-371-7222